100 MW Data Center Project (end-user under NDA)
Project Details Status: On-going Location: undisclosed Supply, testing, and commissioning of FWU (Fan Wall Units) and CRAH (Computer Room Air
Project Details Status: On-going Location: undisclosed Supply, testing, and commissioning of FWU (Fan Wall Units) and CRAH (Computer Room Air
Project Details Status: On going Location: Quezon City Supply, installation, testing and commissioning of water pumps (centrifugal end suction pumps
Project Details Status: Completed 2022 Location: Makati Supply with testing and commissioning of water pumps (submersible pump with cutter and
Project Details Status: Completed 2023 Location: Pasig City Supply of electrical expertise for temporary and permanent power disconnection with dismantling
Project Details Status: Completed 2022 Location: Tarlac City Supply and installation of 4 x water pumps (vertical turbine multistage)
Project Details Status: Completed 2022 Location: Quezon City Supply and installation of fire pump and jockey pump Fire pump :
Project Details Status: Completed 2022 Location: Batangas Supply with testing and commissioning of specialized alcohol product pumps 1 x Centrifugal
Welcome to WordPress. This is your first post. Edit or delete it, then start writing!
General construction with a specialized focus on electrical and mechanical works, and with special support from Maxon Prime PT Technology Indonesia for water pumps, fire pumps, motors, and data center system integration
Copyright © 2023. All rights reserved.